Consumption and power.
Compare the cumulative energy and power demand of the metered feeders. Separate lighting, outlets and HVAC where the architecture allows it. Relate deviations to schedules and conditions of use.
COMMERCIAL · OFFICES & HEADQUARTERS
From workspaces to plant rooms, coordinate the building according to schedules, occupancy and the needs of each zone.
Explore the needs ↓
01FOLLOW THE WORKING DAY
Coordinate lighting, solar shading and regulation according to the schedules and the zones actually in use.
Use caseA team stays after hours: it extends comfort in its own zone, without restarting the whole floor.
Explore smart lighting ↗︎
02ADAPT COMFORT TO THE USE
Distinguish a booking, a detected occupancy and a technical mode. These pieces of information are not interchangeable.
Use caseAn occupied room shows a rise in CO₂: the regulation adapts the ventilation if this is planned, or the team receives a qualified alert.
Explore comfort and air quality ↗︎
03MAKE OPERATION EASIER
Relate consumption to schedules and uses to identify drifts and prepare interventions.
Use caseA flow persists in the washrooms outside occupancy: an alert is created. A shut-off is commanded only if it belongs to the authorized scenario.
Explore supervision ↗︎USEFUL DATA, CLEAR SCOPES
An overall measurement is not the exact consumption of each office. The points, calculation periods and units remain identified in each view.
Compare the cumulative energy and power demand of the metered feeders. Separate lighting, outlets and HVAC where the architecture allows it. Relate deviations to schedules and conditions of use.
Track the volumes and flows of washrooms, kitchens and other equipped sectors. Distinguish cold and hot water if they are metered separately. An exceeded volume does not, by itself, confirm a leak.
Track CO₂, humidity and temperature at the measured points. CO₂ does not describe overall air quality by itself. Occupancy data serves the building’s uses, not the individual monitoring of employees.
AN ARCHITECTURE SUITED TO THE EXISTING INSTALLATION
Plan settings that are easy to understand, authorized ranges and timed overrides. Safety functions remain within their dedicated scope.
KNX, DALI, BACnet or Modbus depending on the products, gateways and licenses selected. A room booking is not presence detection; the link to the software is checked case by case.
Distinguish a command sent from a confirmed status. Display the reading time and link faults; unavailable data does not become a zero value.
Thresholds, time delays, access rights, backups and behavior if communication is lost are defined during the study. No quantified gain is guaranteed without an analysis of the site. Operational sub-metering does not automatically constitute billing-grade metering.
PRODUCTION · CONSUMPTION · SMART MANAGEMENT
Occupancy, schedules and vehicle charging: understand the energy balance of the workspaces.
Without suitable metering and control, unnecessary consumption or power peaks can persist, even with local production.
PRODUCE & MEASURE
Distinguish the consumption of equipped uses, any photovoltaic production, grid import and export.
USE BETTER
Adjust schedules, lighting, HVAC and compatible charging to presence and available power.
SUPERVISE
The BMS brings together the accessible balances, flags drifts and coordinates the authorized commands. Local automation and dedicated protections keep their role.
Offices and headquarters example. Outside occupancy, the planned zones reduce their comfort; permanent equipment stays powered. Non-urgent charging can be modulated according to priorities.
Local production and storage only if present or planned. Functions depend on the sensors, metering and interfaces available; results to be checked over comparable periods, with no guaranteed savings.
NEW BUILD, RENOVATION OR GRADUAL ROLL-OUT
Zones, schedules, networks, equipment and site constraints.
Scenarios, measurements, thresholds, responsibilities and rights.
Controllers, sensors, meters, controls and gateways.
Zones, schedules, supervision, dashboards and alarms.
One floor tested — commands, status feedback, faults — before extension.
Training, configuration file and adjustments after occupancy.
Frequently asked questions
Is your question not listed here? Our team will answer and guide you to the right solution.
commercial@3i-ds.com3I-DS designs the solution, supplies the control equipment, programs it, commissions it and provides follow-up. Depending on the project, we can also install this equipment — screens, sensors, gateways — and take charge of the wiring; otherwise, the site’s installers (electrician, refrigeration technician, plumber) carry it out from our drawings, and we coordinate the tests with them.
The survey identifies the references, accessible interfaces and adaptations needed. Compatibility is not assumed.
Yes, if the scope is metered and its circuits can be identified. An estimated allocation must remain distinct from a dedicated measurement.
No. Scenarios, values and feedback are simulated. Consumption is separate for each zone; the commands do not control any real equipment.
Yes. Schedules, detected presence and room bookings make it possible to reduce heating, air conditioning and lighting in lightly occupied zones.
Yes. The work is organized zone by zone with the site’s contractors, and the programming is tested on a pilot zone before being extended.
FROM NEEDS TO SOLUTIONS
Link comfort, occupancy, consumption and technical operation of the workspaces.
Supervision, alarms and coordination of the technical systems.
Heating, ventilation, air conditioning and air measurements at the equipped points.
Presence, dimming, scenes and solar shading, depending on the equipment.
Consumption, photovoltaic production and exchanges according to the metering plan.
Flows, volumes, alerts and authorized shut-offs; monitoring of water uses.
Schedules, priorities, flexible loads and vehicle charging.
Lighting, blinds and comfort per zone, controlled on the KNX bus.
Functions are defined during the study: equipment, interfaces, control rights and local priorities must be checked. These links do not imply universal compatibility.
YOUR SPACES, YOUR SCHEDULES, YOUR PRIORITIES