02 · MEASURE · ENERGY

Measure the flows. Use energy better.

Identify consumption, track uses and spot deviations. A clear view, from the main meter down to the circuit.

Explore the solutions ↓
LOAD CURVEActive power · kW 42.6 kW 806040200 −24 h−18 h−12 h−6 hNow TODAY’S CONSUMPTION286.4 kWh POWER DEMAND42.6 kW CUMULATIVE ENERGY1,248.6 kWh BREAKDOWN BY USE VENTILATION36% Vent.36%Light.20%HVAC16%Outlets12%Other16% CONSUMPTIONkWh · per 2-hour slot 02040608006 h—08 h—10 h—12 h—14 h—16 h—18 h— USAGE MONITORINGENERGY · kWhPOWER · kW Ventilation—— Air conditioning—— Pumps—— Lighting—— Outlets—— Elevators—— METERING BY ELECTRICAL FEEDER MAIN METER42.6 kW Lighting— kWh— kW Ventilation— kWh— kW Air conditioning— kWh— kW Elevators— kWh— kW Outlets— kWh— kW

FROM METERING TO ANALYSIS

Know where the energy goes.

A single overall reading is not always enough to understand a building. A metering plan spreads the measurements by switchboard, zone or use to give meaning to consumption.

The goal: comparable data, with the right units, consistent periods and a clearly identified scope.

Illustration of electricity meters and current sensors in a distribution board

01MEASURE IN THE RIGHT PLACE

Main metering and sub-metering.

A main meter for the site, sub-meters for switchboards and major loads: every kWh is linked to a zone or a use.

  • Active energy in kWh and power demand in kW
  • Currents, voltages and power factor per phase
  • Direct measurement or via current transformers, depending on the rating
  • Other energies: gas, thermal energy and water via communicating meters

Use case Compare the main switchboard and the sub-boards to find out how much each zone weighs in the site’s consumption.

Discuss this need ↗︎
Illustration of current sensors around the feeders of a switchboard

02GO DOWN TO THE LEVEL OF USES

Track the circuits that matter.

Go down to feeder level: lighting, ventilation, air conditioning, outlets, kitchen or server room.

  • Current sensors and multi-feeder power meters
  • Circuits grouped by zone or by use
  • Technical switchboards and IT rack distribution
  • Persistent consumption outside occupancy identified

An essential distinction A current sensor measures amperes. To obtain kWh, voltage and power factor are also needed: that is the role of the power meter.

Discuss this need ↗︎
Illustration of an energy analysis workstation with curves and consumption reports

03UNDERSTAND THE DEVIATIONS

Dashboards that are useful.

History, comparisons and indicators to spot the uses that deserve action.

  • Load curves and consumption by day, week and month
  • Breakdown by use and by zone
  • Indicators: kWh/m², nighttime baseload and power peak
  • Thresholds, alerts, periodic reports and exports

Use case A nighttime baseload appears on the curve: it is compared with the schedules and the equipment left running.

Discuss this need ↗︎

04 / COLLECT AND SHARE

A coherent metering architecture.

Meters communicate over Modbus, M-Bus or pulses with a data collection unit, which feeds the dashboards and the BMS.

Depending on the project, this unit also provides the monitoring interface; integration is checked on the equipment selected.

  • ModbusElectricity meters, inverters, power meters.
  • M-BusWater, heat and gas meters.
  • PulsesExisting meters fitted with a pulse output.
Review my metering architecture ↗︎
DASHBOARDSCurves · breakdown · history
COLLECTION UNIT / PROJECT-DEPENDENTModbus · M-Bus · pulsesModbus · M-Bus · pulses
MainSite measurementModbus
Sub-meteringSwitchboards and zonesModbus · M-Bus
CircuitsTargeted usesModbus · pulses
Hover over or tap a protocol or a box

INDICATORS WITHOUT CONFUSION

Each measurement has its unit.

kWh

Energy

Energy consumed or produced, accumulated over an identified period.

kW

Power

The level of active power at a given moment.

A / V

Current / voltage

Electrical quantities that are distinct from energy.

m³

Water volume

Read by a communicating water meter.

Photovoltaic installation with inverter and metering of electrical exchanges

06TRACK PHOTOVOLTAIC PRODUCTION

Production, consumption and exchanges in a single view.

Inverters, meters and battery brought together over a common period to read the site’s actual balance.

  • Photovoltaic power in kW and energy produced in kWh
  • Site consumption and the share covered directly by production
  • Energy drawn from the grid and energy exported, measured separately
  • Battery charge, discharge and state of charge
  • Inverter history and faults

Example without storage 20 kW produced supply 15 kW of consumption; the remaining 5 kW are exported to the grid if the connection allows it. This is an instantaneous balance, not a daily energy figure.

The balance relies on a bidirectional meter at the grid connection point and on the inverter interfaces.

Move from metering to coordinating uses ↗︎

INDICATORS TO DEFINE

Do not confuse production, self-consumption and self-sufficiency.

PRODUCTION & EXCHANGES

Measure the right flows.

Three measurement points: production, the grid connection point and consumption by the loads. The grid meter alone is not enough.

1,500 – 1,700kWh per kWp per year in Tunisia, depending on region and orientation: a 100 kWp installation produces about 150,000 to 170,000 kWh/year.
SELF-CONSUMPTION

The energy used on site.

Share of production consumed on site, calculated over a given period. With a battery, direct consumption, storage and losses are distinguished.

70%Example: 100 kWh produced, of which 70 kWh consumed on site.
SELF-SUFFICIENCY

The share of needs covered.

Share of consumption covered by local production. A state of charge in % indicates neither the kWh available nor a backup duration.

35%Example: 200 kWh consumed, of which 70 kWh from solar.

kWp: installed panel power · kW: measured power · kWh: cumulative energy. The design and grid connection of the photovoltaic installation are covered by a separate scope.

BATTERIES · MEASUREMENTS AND LIMITS

Understand storage before controlling it.

Status and exchanges.

State of charge in %, charge and discharge power in kW, cumulative energy in kWh.

40 kWhExample: a 100 kWh battery at 60% with a 20% reserve has 40 kWh usable.

Health and alarms.

Temperatures, alarms and state of health reported by the battery management system.

≈ 90%Typical round-trip efficiency of a lithium battery; state of health decreases with cycles.

Controlled commands.

Charge, discharge and reserve follow the optimization strategy; the battery management system and the inverter keep their limits and protections.

20 to 30%Common backup reserve, set in the inverter; it can be much higher where grid outages are frequent.
Define the authorized storage strategies ↗︎

TRACK AND QUALIFY EVENTS

A visible anomaly, a context to analyze it.

Before concluding there is a production fault, the equipment, the communication and the conditions at that moment are checked.

Equipment faults.

Codes and statuses of inverters, meters and batteries, with the site, the device, the time and the priority.

3 levelsInformation, warning, alarm: each level has its recipients and its response time.

Communication and data.

Equipment stopped, zero production or link down: three distinct cases. An unavailable value is never displayed as zero.

10 minExample: data not refreshed after 2 missed readings is flagged as stale.

Production deviations.

A drop is read alongside sunlight, temperature and shading. Without a reference sensor, a deviation remains a lead, not a diagnosis.

> 15%Example rule: deviation from the reference over 3 sunny days, a lead to check.

Recipients, thresholds and acknowledgments are defined with the operator. Notifications do not replace local protections.

FROM THE LOCAL SITE TO THE CENTRAL VIEW

Monitor several installations without losing their context.

A central view brings all the sites together, with the detail of each installation one click away.

Overview.

Production, consumption, exchanges and storage per site, with the freshness of each data point.

5 to 15 minCommon reading interval for a central view; finer for monitored power values.

Consistent comparisons.

Installed power, weather and availability differ from one site to another: ratios are compared, not raw kWh.

4.6 / 3.9kWh per kWp per day: two sites compared by ratio; the gap needs explaining.

Rights and continuity.

Rights by role and by site, link alarm, local collection and history recovery after an outage.

7 daysExample of history kept locally to recover data after an outage.

Central supervision replaces neither local automation nor protections. Remote access is validated with the IT managers.

Link monitoring to technical supervision ↗︎

INTERFACES · PROTOCOLS · RIGHTS

Make systems communicate, then check what is accessible.

The choice is made on the references, versions and documentation of the equipment.

Modbus TCP or RTU.

Addresses, registers, units and scale factors are checked point by point. Reading and writing are validated separately.

Port 502Modbus TCP; a register holds 16 bits, often with a scale factor (×0.1 or ×0.01).

SunSpec models.

Common data models over Modbus for compatible inverters and meters; we check which ones the device actually implements.

101 – 103SunSpec models for single- and three-phase inverters; 201 to 204 for meters.

Manufacturer API.

Data exposed, authentication, request limits, local or cloud access. Many APIs are read-only.

5 minCommon time step for cloud data; local Modbus access is often finer.

In multi-site setups, the link is secured and segmented: no equipment interface is exposed directly to the Internet. Loss of communication and recovery are tested before commissioning.

FROM METERING PLAN TO FOLLOW-UP

Our approach, step by step.

  1. 01TargetWith you

    Zones, uses and indicators to track; the operator’s objectives.

  2. 02SurveyWith you

    Existing switchboards, ratings, diagrams and meters.

  3. 03Metering plan3I-DS

    Measurement points, meter type and protocol for each feeder.

  4. 04Supply3I-DS

    Meters, power meters, current transformers and collection unit.

  5. 05Configuration3I-DS

    Collection, dashboards, thresholds and reports; consistency check of meter readings.

  6. 06Follow-up3I-DS

    Training, first reports and threshold adjustment with the operator.

What you receive
  • Metering plan
  • List of meters and addresses
  • Configured dashboards
  • Thresholds and alerts
  • First reports
  • Configuration file
  • Operator training

Frequently asked questions

Your questions,
our answers.

Is your question not listed here? Our team will answer and guide you to the right solution.

commercial@3i-ds.com
Who installs the meters?

Depending on the project, 3I-DS can install the meters and current transformers in the switchboards and take charge of their wiring, or rely on the electrical contractor. 3I-DS designs the solution, supplies the equipment, configures the collection and checks the measurements.

Can existing meters be kept?

Yes, if they have a communication output (Modbus, M-Bus or pulses) and sufficient accuracy. The survey confirms this meter by meter.

Does monitoring automatically lead to savings?

No: measuring reduces nothing by itself. Monitoring shows where to act — schedules, settings, equipment — and then checks the effect of the actions.

Can costs be displayed?

Yes, by applying the tariffs and time bands of your contract to the kWh. The amount remains an estimate: the supplier’s bill prevails.

Can water and gas be monitored?

Yes, with pulse or M-Bus meters connected to the same collection unit.

Which meters do you use?

Communicating meters suited to each use: electricity over Modbus or M-Bus, water and gas via pulses or M-Bus, with current transformers for existing feeders.

How often is data read?

Generally every 5 to 15 minutes for consumption, more often for power values to be monitored. The interval is set according to the use and the storage capacity.

Can data be exported?

Yes, as CSV-type files or periodic reports, for your internal reports, an energy audit or an engineering consultant.

START WITH THE RIGHT MEASUREMENT POINTS

Which uses would you like to understand?