PRODUCTION · INDUSTRY

Understand the uses. Make technical monitoring reliable.

Metering, utilities and alarms: make the installations easy to read and gradually integrate compatible equipment, depending on the operating scope.

Explore the needs ↓
Illustration of a contemporary industrial workshop and its technical installations
Illustration of industrial switchboards fitted with measurement points

01IDENTIFY THE USES

From the main meter to the significant loads.

Draw up a metering plan to distinguish workshop, utilities, logistics and associated buildings, without counting the same flows twice.

  • Energy in kWh, power in kW and history at the equipped points
  • Water in m³ and flow depending on the metered network
  • Operating hours, peaks and consumption outside production
  • Compressed air, gas or other fluids only with a suitable measurement and units
  • Indicators related to production if the quantities and scopes are reliable

Operating example Consumption persists during a workshop shutdown: the operator checks the sub-meters and the permanent uses before deciding on an action.

A kWh-per-part ratio is relevant only if the outputs compared and the metering boundaries are comparable too. An increase does not, by itself, identify a breakdown or an inefficiency.

Explore topic 02 · Measure ↗︎
Illustration of a utilities room with compressor, tank and pumping

02MONITOR THE TECHNICAL INSTALLATIONS

Localized events, useful for intervention.

Bring together the accessible statuses of utilities and buildings: pumping, reservoirs, compressed air, ventilation and compatible electrical equipment.

  • Run, stop and fault from the validated interfaces
  • Pressures, temperatures, levels and flows at the metered points
  • Faults, drifts and loss of communication distinguished
  • History with zone, equipment, time and defined priority
  • Acknowledgment, recipients and intervention tracking as per the offer

Operating example An unusual pressure is reported with the available curve and the compressor status. The team checks the installation; the supervision system does not automatically conclude there is a leak.

Water shut-offs and pump commands are limited to the authorized networks and functions. Cooling, processes, fire protection and other permanent needs are not treated as freely interruptible uses.

01Spot

The curve exceeds the level usually observed outside production. The operator checks the period, data freshness and permanent uses before recording a deviation.

Baseload at shutdown42 kWUsual30 kW
02Check on site

The team examines the statuses of the auxiliaries and the residual needs. A targeted search is decided if necessary; monitoring alone cannot locate a leak or a breakdown.

Compressor 2runningWorkshop ventilationstopped
03Intervene

The authorized manager validates a correction or a maintenance intervention. Date, equipment, finding and action are recorded, in compliance with local instructions and protections.

09:15Compressor 2 stoppedDone
04Compare

After correction, compare periods of relevant duration and activity. Document weather, production, changes of use and missing data before drawing conclusions about the effects.

Before42 kWAfter31 kWComparable workshop shutdowns

PRODUCTION · CONSUMPTION · SMART MANAGEMENT

Producing is not enough to keep consumption under control.

Set industrial needs against any local production, grid exchanges and storage if present. Unnecessary consumption can persist without analysis or suitable actions.

01

PRODUCE & MEASURE

Measure the actual balance.

Relate the metering of workshops and utilities to any photovoltaic production over consistent periods.

Solar / week35%Self-consumed83%Exported17%
Production & metering
02

USE BETTER

Adapt what can be adapted.

Study the lighting of unoccupied zones, auxiliary schedules and loads that are truly deferrable. Continuity, product quality and process constraints keep priority.

Line stoppedUtilities reducedSolar surplusLoads shiftedPower peakLoad shedding allowed
Energy optimization
03

SUPERVISE

Supervise the effects.

Review reports, drifts and authorized commands. Compare relevant activity conditions before attributing a variation to the settings.

Nighttime consumptiondrift reportedAuthorized commandconfirmed
BMS supervision

Production and storage only according to the site’s equipment. No quantified gain, savings or availability is guaranteed by supervision alone.

A PILOT ZONE BEFORE ROLL-OUT

Our approach, step by step.

  1. 01ScopingWith you

    Uses, production constraints, priority installations and responsibilities.

  2. 02Design3I-DS

    Measurement points, interfaces, units and data quality rules.

  3. 03Supply3I-DS

    Meters, power meters, controllers and gateways.

  4. 04Programming3I-DS

    Collection, alarms, dashboards, reports and access rights.

  5. 05Pilot zone3I-DS + you

    Reading, alarms, loss of communication and recovery tested on one workshop.

  6. 06Extension3I-DS + you

    Results validated with the operator, then extension to the other workshops or sites.

What you receive
  • Utilities metering plan
  • Points list
  • Pilot zone validated
  • Test report
  • Dashboards per workshop
  • Programming file
  • Operator training

BEFORE THE FIRST MEETING

The useful documents to get started.

What to prepare for a first study.

  • Drawings of the buildings, workshops and networks concerned, single-line diagrams and labeling of the available switchboards.
  • List of meters, sensors and equipment: brand, reference, version, protocol and interface documentation.
  • Consumption history or available bills, with periods and scopes identified.
  • Schedules, shifts, planned shutdowns and production data usable for the indicators considered.
  • Process constraints, permanent needs, non-interruptible loads and control limits.
  • Operations, maintenance and IT/OT contacts; access and communication rules to review together.
  • Project priorities, pilot zone, expected alarms and report or export needs.
Prepare the study of my industrial site ↗︎

Frequently asked questions

Your questions,
our answers.

Is your question not listed here? Our team will answer and guide you to the right solution.

commercial@3i-ds.com
Who carries out the work?

3I-DS designs the solution, supplies the control equipment, programs it, commissions it and provides follow-up. Depending on the project, we can also install this equipment — screens, sensors, gateways — and take charge of the wiring; otherwise, the site’s installers (electrician, refrigeration technician, plumber) carry it out from our drawings, and we coordinate the tests with them.

Does all the equipment have to be replaced?

Existing equipment is surveyed to check its interfaces. Depending on the project, data collection, additional sensors or a gateway may be needed.

Can a machine be controlled from the supervision system?

This is not assumed. Any command requires a study of rights, status feedback, priorities and risks with the process managers; some points remain strictly read-only.

Can several plants be supervised?

If the links and interfaces allow it, a central view can bring together the data from the sites. Scopes, rights, data freshness and the maintenance of local functions are defined site by site.

Can the data feed our existing tools?

Yes, depending on the interfaces available: file export, database, or OPC UA or Modbus protocol to a CMMS, an ERP or a production supervision system.

How can disruption to production be avoided?

The supervision system observes without controlling the production machines, unless explicitly agreed. Tests are carried out outside production or on a pilot zone.

YOUR WORKSHOPS, YOUR PRIORITIES

Technical monitoring suited to your operation.