Both rely on controllers, a network and supervision. They differ in breadth of scope and level of optimization. A well-designed CTM can evolve into a BMS without replacing everything.
CTM · Centralized technical management
Centralize the monitoring and control of one technical installation, often a single system: heating, ventilation or metering. Statuses, faults and alarms are gathered in one place.
ScopeOne systemAlarmsOn / off
The question it answers: “Is my installation working?”
BMS · Building management system
Coordinate several systems across the building — HVAC, lighting, energy, water — with shared regulation, schedules and scenarios. It targets energy performance as much as monitoring.
ScopeHVACLightingEnergyWaterScenarios
The question it answers: “Is my building consuming just what it needs?”
Efficiency classes · EN ISO 52120-1 (replaces EN 15232-1)
CLASS D
Not energy-efficient
Manual control or simple on / off, with no automatic regulation. A level to upgrade.
Example: air conditioners switched on by hand, lighting left on in the evening.
+51%Heating / cooling+10%Electricity
CLASS C
Standard
Basic regulation and technical management. This is the standard’s reference class.
Example: zone thermostats, fixed timers, alarms reported to a workstation.
ReferenceHeating / coolingReferenceElectricity
CLASS B
Advanced
Communicating zone regulation, schedules, supervision and consumption monitoring. A common target in renovation.
Example: reduced setpoints outside occupancy, metering by use, drift alerts.
−20%Heating / cooling−7%Electricity
CLASS A
High performance
Regulation based on actual demand, coordination between systems and active energy management. The target for efficient new buildings.
Example: presence, CO₂ and sunlight drive HVAC, blinds and lighting together.
−30%Heating / cooling−13%Electricity
Orders of magnitude given by the standard’s BAC factor method for offices, compared with class C (“Electricity”: lighting and auxiliaries). The actual gain depends on the building, its use and how it is operated.
02SEE AND UNDERSTAND
Supervision that is easy to read every day.
A single workstation to find the installations by building, floor or zone: statuses, measurements, alarms and history.
Mimic diagrams of the installations, running statuses and faults
Setpoints and commands according to each user’s rights
Prioritized alarms, acknowledgment and event history
Trend curves and reports to analyze drifts
Use caseAn abnormal temperature? The operator checks the curve, the equipment status and the related alarms before intervening.
Controllers run the sequences right next to the equipment. They keep working if the supervision system is unavailable: this behavior is defined at the design stage.
Controllers with suitable inputs and outputs
Acquisition of sensors and status feedback
Control of valves, pumps, fans and actuators
Programming of sequences, schedules and operating modes
Energy and metering in the same supervision system.
Electricity, thermal energy and water meters report to the BMS: all consumption is linked to a use, a zone or a building.
Electricity, heat and water meters over Modbus or M-Bus
Consumption by use, zone and period, in kWh and m³
Out-of-hours operation and power peaks reported
Photovoltaic production and self-consumption where the site has them
Use caseAbnormal nighttime consumption: the curve shows ventilation left running. The schedule is corrected and the effect shows in the following month’s report.
The irrigation controller and the pool system remain autonomous; the BMS provides their readings and the authorized commands.
Irrigation: programs per sector, suspended according to rain or moisture
Irrigation flow and volume, alert on excess flow or stuck valve
Pool: filtration, water temperature, level and top-up
Pump faults and treatment measurements from the dedicated controller
Operating exampleAn irrigation sector shows an abnormal flow: the event is located and the sector is stopped if this scenario is planned. Pool water treatment remains managed by its own controller.
Each system speaks its own protocol. The architecture brings them together in one supervision system, checking for each device which data can be read and which commands are authorized.
If the supervision system stops, the controllers carry on with their sequences. Loss of communication, manual mode and restart are tested at commissioning.
SupervisionstoppedControllerssequences runningLocal controlsavailableRecoverytested at commissioning
Coordination exampleWhen unoccupied, lighting and comfort switch to reduced mode; irrigation and pool keep their programs. A leak shuts off only its own sector.
19:00UnoccupiedLighting reducedComfort reducedIrrigation: calendarPool: programLeaksector BOnly sector B shut off
Maintenance and service commitments are covered by a separate contract.
FROM AUDIT TO FOLLOW-UP
Our approach, step by step.
01Audit & needsWith you
Survey of the existing installation, inventory of systems, operating objectives and target efficiency class.
02Design3I-DS
Functional analysis, points list, architecture, protocols and mimic diagrams to validate.
03Supply3I-DS
Controllers, gateways, sensors and supervision workstation. Wiring and control panels by 3I-DS or the electrical contractor, depending on the project.
04Programming3I-DS
Controller sequences, mimic diagrams, alarms, history and user rights.
05Testing & acceptance3I-DS + you
Point-by-point tests with the site’s contractors, functional and communication-loss tests, acceptance report.
06Follow-up3I-DS
Training, programming file and backups, operational follow-up and adjustments.
What you receive
Functional analysis
Points list
Validated mimic diagrams
Test report
Programming file
Backups
Operator training
Frequently asked questions
Your questions, our answers.
Is your question not listed here? Our team will answer and guide you to the right solution.
Depending on the project, yes. 3I-DS always handles equipment supply, programming and follow-up; we can also install the control equipment and take charge of the wiring. Otherwise, the electrical contractor carries out the wiring and panels from our drawings: we provide the points list and run the tests together.
Can equipment already in place be integrated?
The audit identifies the protocols, interfaces, licenses and accessible data of each device. Some require a gateway, an adaptation or a replacement.
Which ISO 52120-1 class should we aim for?
Class B is a common target in renovation, class A for an efficient new building. The audit establishes the current class and the functions to add in order to progress.
What information should be prepared for the study?
The available drawings, equipment references, panel diagrams, the list of systems to integrate and the operators’ needs.
Is the supervision system accessible remotely?
Yes, if this need is included: accounts, rights and connection arrangements are defined with the site’s IT manager.
Which protocols do you use?
Open protocols depending on the systems: BACnet, Modbus, KNX, M-Bus or DALI. They make it possible to integrate equipment from different brands and to expand the installation.
How long does a BMS project take?
It depends on the number of points and on the progress of the construction work. The study and functional analysis generally take a few weeks; programming progresses alongside the works and testing follows the end of wiring.
What happens after acceptance?
We fine-tune the settings after the first weeks of operation, keep the backups and intervene remotely or on site according to the agreed follow-up contract.
FROM NEEDS TO SOLUTIONS
In which sectors can this solution be applied?
Find the operating needs that the BMS & supervision solution can address, depending on the project scope.
Functions are defined during the study: equipment, interfaces, control rights and local priorities must be checked. These links do not imply universal compatibility.