01 · CONTROL · BMS

See the installations. Act with the right context.

Connect the equipment. Understand the statuses. Act from an interface designed for operating your building.

Explore the solutions ↓
ENERGY · kWh185.0 kWh PROFILE · kWh30.8 kWh BREAKDOWN / LOAD38%64%VENT.LOAD MEASUREMENTSAir1850 m³/hLight.38.6 kWhTemp.22.0 °CWater8.42 m³ VENTILATION1850 m³/h LIGHTING38.6 kWh TEMPERATURE22.0 °C WATER8.42 m³

UNDERSTANDING THE LEVELS OF CONTROL

CTM or BMS: which is which?

Both rely on controllers, a network and supervision. They differ in breadth of scope and level of optimization. A well-designed CTM can evolve into a BMS without replacing everything.

CTM · Centralized technical management

Centralize the monitoring and control of one technical installation, often a single system: heating, ventilation or metering. Statuses, faults and alarms are gathered in one place.

ScopeOne systemAlarmsOn / off

The question it answers: “Is my installation working?”

BMS · Building management system

Coordinate several systems across the building — HVAC, lighting, energy, water — with shared regulation, schedules and scenarios. It targets energy performance as much as monitoring.

ScopeHVACLightingEnergyWaterScenarios

The question it answers: “Is my building consuming just what it needs?”

Efficiency classes · EN ISO 52120-1 (replaces EN 15232-1)

CLASS D

Not energy-efficient

Manual control or simple on / off, with no automatic regulation. A level to upgrade.

Example: air conditioners switched on by hand, lighting left on in the evening.

+51%Heating / cooling+10%Electricity

CLASS C

Standard

Basic regulation and technical management. This is the standard’s reference class.

Example: zone thermostats, fixed timers, alarms reported to a workstation.

ReferenceHeating / coolingReferenceElectricity

CLASS B

Advanced

Communicating zone regulation, schedules, supervision and consumption monitoring. A common target in renovation.

Example: reduced setpoints outside occupancy, metering by use, drift alerts.

−20%Heating / cooling−7%Electricity

CLASS A

High performance

Regulation based on actual demand, coordination between systems and active energy management. The target for efficient new buildings.

Example: presence, CO₂ and sunlight drive HVAC, blinds and lighting together.

−30%Heating / cooling−13%Electricity

Orders of magnitude given by the standard’s BAC factor method for offices, compared with class C (“Electricity”: lighting and auxiliaries). The actual gain depends on the building, its use and how it is operated.

Illustration of an operator workstation with HVAC mimic diagrams and alarms

02SEE AND UNDERSTAND

Supervision that is easy to read every day.

A single workstation to find the installations by building, floor or zone: statuses, measurements, alarms and history.

  • Mimic diagrams of the installations, running statuses and faults
  • Setpoints and commands according to each user’s rights
  • Prioritized alarms, acknowledgment and event history
  • Trend curves and reports to analyze drifts

Use caseAn abnormal temperature? The operator checks the curve, the equipment status and the related alarms before intervening.

Discuss this need ↗︎
Illustration of a control panel with controllers and input/output modules

03CONTROL AND REGULATE

Automation close to the field.

Controllers run the sequences right next to the equipment. They keep working if the supervision system is unavailable: this behavior is defined at the design stage.

  • Controllers with suitable inputs and outputs
  • Acquisition of sensors and status feedback
  • Control of valves, pumps, fans and actuators
  • Programming of sequences, schedules and operating modes
Discuss this need ↗︎
Illustration of rooftop HVAC units with ducts and control equipment

04ADAPT TO USE

Coordinated control of HVAC and plant.

Heating, air conditioning and ventilation follow schedules, zones and occupancy; heating and cooling production adapts to actual demand.

  • Heating and cooling production: boilers, chillers, heat pumps
  • Air handling units, ventilation and air quality
  • Hydraulic circuits, pumps, valves and domestic hot water
  • Zone setpoints and occupied / unoccupied modes

Use caseAt night and on weekends, zones switch to reduced mode; cooling production stops when no zone is calling for it.

See the HVAC solution ↗︎
Illustration of electricity meters and current sensors in a distribution board

05MEASURE TO CONTROL

Energy and metering in the same supervision system.

Electricity, thermal energy and water meters report to the BMS: all consumption is linked to a use, a zone or a building.

  • Electricity, heat and water meters over Modbus or M-Bus
  • Consumption by use, zone and period, in kWh and m³
  • Out-of-hours operation and power peaks reported
  • Photovoltaic production and self-consumption where the site has them

Use caseAbnormal nighttime consumption: the curve shows ventilation left running. The schedule is corrected and the effect shows in the following month’s report.

See energy metering ↗︎
Illustration of lighting controls and luminaires in a meeting room

06LIGHTING AND ELECTRICAL DISTRIBUTION

Lighting and switchboards under control.

Lighting follows schedules and presence; major electrical equipment reports its statuses and faults.

  • KNX or DALI lighting: schedules, presence, daylight and scenes
  • Switchboards: circuit breakers, load shedding and power demand
  • UPS units, generators and elevators: statuses and faults
  • Fire and intrusion alarms reported as read-only

SafetyFire safety and intrusion systems keep their own control panels: the BMS displays their statuses and never controls them.

See the lighting solution ↗︎
Sector-based irrigation of a landscaped site and water metering

07OUTDOOR AREAS AND PLANT ROOMS

Irrigation and pool in the same view.

The irrigation controller and the pool system remain autonomous; the BMS provides their readings and the authorized commands.

  • Irrigation: programs per sector, suspended according to rain or moisture
  • Irrigation flow and volume, alert on excess flow or stuck valve
  • Pool: filtration, water temperature, level and top-up
  • Pump faults and treatment measurements from the dedicated controller

Operating exampleAn irrigation sector shows an abnormal flow: the event is located and the sector is stopped if this scenario is planned. Pool water treatment remains managed by its own controller.

See water and leaks ↗︎

08 / MAKING SYSTEMS COMMUNICATE

Connecting the technical systems.

Each system speaks its own protocol. The architecture brings them together in one supervision system, checking for each device which data can be read and which commands are authorized.

  • BACnetBuilding automation: HVAC, plant, controllers.
  • ModbusMeters, inverters, pumps, technical equipment.
  • M-BusWater, heat and energy meters.
  • KNXRoom controls, blinds, ambient sensors.
  • DALILighting: dimming, scenes and luminaire faults.

Depending on the existing installation: LON, SNMP, OPC UA or MQTT, with gateways if necessary.

Review my site’s interfaces ↗︎
SUPERVISIONViews · alarms · history
NETWORK & CONTROLLERSBACnetModbusM-BusKNXDALIdepending on equipment
SensorsMeasurementsKNX · Modbus
HVACStatuses and commandsBACnet · Modbus
MeteringWater and energyM-Bus · Modbus
IrrigationSectors and programsModbus
ElectricalSwitchboards and UPS unitsModbus
LightingCircuits and scenesDALI · KNX
Hover over or tap a protocol or a box · indicative architecture, to be adapted after a technical audit

PLAN THE SYSTEMS AND PRIORITIES

A complete scope, defined point by point.

The study assigns the roles: what the BMS measures, what it controls and what remains managed by dedicated automation.

Scoping list · to be completed during the site audit
SystemWhat the BMS measuresWhat it controlsPriorities to validate
HVAC and plant Temperatures, CO₂, humidity, statuses and faults of the plant and air handling units.Setpoints, modes, schedules and accessible commands.Permanent needs, regulation priorities and machine protections.
Lighting and solar shading Statuses, levels, presence and illuminance.Scenes, dimming, programs and blind positions.Permanent circuits, wind safety and local controls.
Electrical and plant rooms Circuit breakers, power demand, UPS units, generators and elevators.Load shedding, history and maintenance alerts.Circuits that cannot be shed and the autonomy of each device.
Energy and metering Electricity, thermal energy and water, in kWh and m³.Reports, thresholds and comparisons by period.Synchronized readings, missing data flagged, no double counting.
Cold water, hot water and leaks Volumes, flows, temperatures and leak sensors.Alerts and validated sector shut-offs.Check before reopening, and uses that must never be cut off.
Irrigation and pool Sectors, flows, filtration, temperature and level.Programs, weather suspension, timed manual control.Autonomy of the dedicated controllers and priorities between water uses.
Fire safety and security Statuses and alarms reported as read-only.Display, history and transmission to operators.No command from the BMS: the dedicated panels stay in control.

FROM AUDIT TO FOLLOW-UP

Our approach, step by step.

  1. 01Audit & needsWith you

    Survey of the existing installation, inventory of systems, operating objectives and target efficiency class.

  2. 02Design3I-DS

    Functional analysis, points list, architecture, protocols and mimic diagrams to validate.

  3. 03Supply3I-DS

    Controllers, gateways, sensors and supervision workstation. Wiring and control panels by 3I-DS or the electrical contractor, depending on the project.

  4. 04Programming3I-DS

    Controller sequences, mimic diagrams, alarms, history and user rights.

  5. 05Testing & acceptance3I-DS + you

    Point-by-point tests with the site’s contractors, functional and communication-loss tests, acceptance report.

  6. 06Follow-up3I-DS

    Training, programming file and backups, operational follow-up and adjustments.

What you receive
  • Functional analysis
  • Points list
  • Validated mimic diagrams
  • Test report
  • Programming file
  • Backups
  • Operator training

Frequently asked questions

Your questions,
our answers.

Is your question not listed here? Our team will answer and guide you to the right solution.

commercial@3i-ds.com
Do you carry out the wiring and control panels?

Depending on the project, yes. 3I-DS always handles equipment supply, programming and follow-up; we can also install the control equipment and take charge of the wiring. Otherwise, the electrical contractor carries out the wiring and panels from our drawings: we provide the points list and run the tests together.

Can equipment already in place be integrated?

The audit identifies the protocols, interfaces, licenses and accessible data of each device. Some require a gateway, an adaptation or a replacement.

Which ISO 52120-1 class should we aim for?

Class B is a common target in renovation, class A for an efficient new building. The audit establishes the current class and the functions to add in order to progress.

What information should be prepared for the study?

The available drawings, equipment references, panel diagrams, the list of systems to integrate and the operators’ needs.

Is the supervision system accessible remotely?

Yes, if this need is included: accounts, rights and connection arrangements are defined with the site’s IT manager.

Which protocols do you use?

Open protocols depending on the systems: BACnet, Modbus, KNX, M-Bus or DALI. They make it possible to integrate equipment from different brands and to expand the installation.

How long does a BMS project take?

It depends on the number of points and on the progress of the construction work. The study and functional analysis generally take a few weeks; programming progresses alongside the works and testing follows the end of wiring.

What happens after acceptance?

We fine-tune the settings after the first weeks of operation, keep the backups and intervene remotely or on site according to the agreed follow-up contract.